Charge session

KDC 881K · 12 Sept 2026, 10:36

CompletedDC fast

CHJ-DEV-00A3-1789198592-330

KDC 881K · CHJ-PK-0043 · CHAJI Thika Road

Energy
4.030 kWh
Duration
33m
Peak power
7.46 kW

Session details

Start time
12 Sept 2026, 10:36
Finish time
12 Sept 2026, 11:09
Initial meter
2,140.236 kWh
Final meter
2,144.406 kWh
Charge
18% → 77%
Pack voltage
64.679.0 V
Meter source
Charger meter
End reason
Charger removed
Battery
CHJ-PK-0043
Device
CHJ-DEV-00A3
Session duration
33m

At a glance

Charge

Energy delivered

Peak power

Average power

Hottest reading

Energy consumed

Final meter

2,144.406 kWh

Initial meter

2,140.236 kWh

Energy consumed

4.170kWh

Off by 0.140 kWhDevice-integrated energy 4.030 kWh, within ±0.02 kWh to bill as-is.

Meter values

Voltage, current, power, energy, state of charge and temperature during session CHJ-DEV-00A3-1789198592-330