Charge session

KDD 302R · 20 Sept 2026, 12:48

CompletedDC fast

CHJ-DEV-00A4-1789897709-456

KDD 302R · CHJ-PK-0044 · CHAJI Industrial Area

Energy
3.412 kWh
Duration
53m
Peak power
4.60 kW

Session details

Start time
20 Sept 2026, 12:48
Finish time
20 Sept 2026, 13:42
Initial meter
121.202 kWh
Final meter
124.856 kWh
Charge
15% → 96%
Pack voltage
66.181.5 V
Meter source
Charger meter
End reason
Charge complete
Battery
CHJ-PK-0044
Device
CHJ-DEV-00A4
Session duration
53m

At a glance

Charge

Energy delivered

Peak power

Average power

Hottest reading

Energy consumed

Final meter

124.856 kWh

Initial meter

121.202 kWh

Energy consumed

3.654kWh

Off by 0.242 kWhDevice-integrated energy 3.412 kWh, within ±0.02 kWh to bill as-is.

Meter values

Voltage, current, power, energy, state of charge and temperature during session CHJ-DEV-00A4-1789897709-456