Charge session

CCD 720J · 12 Sept 2026, 18:40

InterruptedOver temperatureDC fast

CHJ-DEV-00C2-1789227624-270

CCD 720J · CHJ-PK-0062 · CHAJI Ngong Road

Energy
3.542 kWh
Duration
18m
Peak power
11.90 kW

Session details

Start time
12 Sept 2026, 18:40
Finish time
12 Sept 2026, 18:58
Initial meter
1,649.509 kWh
Final meter
1,653.043 kWh
Charge
18% → 65%
Pack voltage
66.875.7 V
Meter source
Charger meter
End reason
Over temperature
Battery
CHJ-PK-0062
Device
CHJ-DEV-00C2
Session duration
18m

At a glance

Charge

Energy delivered

Peak power

Average power

Hottest reading

Energy consumed

Final meter

1,653.043 kWh

Initial meter

1,649.509 kWh

Energy consumed

3.534kWh

Meters agreeDevice-integrated energy 3.542 kWh, within ±0.02 kWh to bill as-is.

Meter values

Voltage, current, power, energy, state of charge and temperature during session CHJ-DEV-00C2-1789227624-270